We build websites, branding and apps — pragmatic, conversion-led, built to ship.

Selected work

  • Exile

    3D commercials for a cosmetics brand

    A concept 3D commercial series for a cosmetics brand. Each product gets its own scene with its own palette and material.

  • Forever Estates Dubai real estate landing preview

    Forever Estates

    Real estate in Dubai

    A site for a Dubai real-estate consulting firm. Tuned for lead capture from their YouTube audience — the client's revenue has already passed $1M a year.

  • Vicube studio landing preview

    Vicube

    Video production studio

    Concept landing for a video production studio — editorial layout, cinematic mood. Each section gets its own hand-picked clip, so the whole page plays like one edited reel.

  • Autocubes Kit landing template preview

    Autocubes Kit

    Landing page template

    Concept for a universal landing page for SaaS, startups, or agencies. A cohesive block system with large typography and a calm palette.

  • Le Cube brand studio landing preview

    Le Cube

    Brand studio

    Concept landing for a luxury brand studio. Oversized type, marquee accents, and plenty of white space give it a confident magazine-style voice.

  • CubeKit Pro brand-system landing preview

    CubeKit Pro

    Brand-system platform

    Concept for a brand-book platform — helps teams systematize, document, and keep their brand consistent everywhere it shows up.

  • Lanvio AI automation landing preview

    Lanvio

    AI automation platform

    Concept landing for a subscription-based AI automation service. A dark, monochrome one-pager built for SaaS teams and startups.

  • Flowline habit tracker landing preview

    Flowline

    Habit-tracking app

    Concept landing for a mobile habit-tracking app. Bento layout of self-contained selling blocks.

  • CubeHill agri-tech landing preview

    CubeHill

    Agri-tech company

    Concept landing for agri-tech companies and organic farms. Corporate tone, full-bleed video background, and real farm numbers.

  • Korg volca bass

    Stylized motion piece

    Personal piece — a stylized 3D motion study of the Korg volca bass. Monochrome chassis renders shift into photoreal shots, and the edit pulls it all together to give the reel its drive.

  • Inside a Daya Bay antineutrino detector — photomultiplier-tube array, with kernel speed-up overlay

    Speeding up scientific code

    Code audit and refactor

    Audit and refactor of a neutrino-physics analysis codebase. The project's core was rewritten in C + Cython — identical numerics, roughly 100× faster than the original Python implementation.

  • Junior Notes — frontend knowledge base with sidebar navigation and graph view

    Junior Notes

    Frontend knowledge base

    An open knowledge base on frontend development — about 1465 notes across 17 topics, from CSS and JavaScript to DevOps and soft skills. Runs on our own markdown-publish engine and ships as a fast static site.

  • Geometric Games — abstract purple shapes for cut, inscribe, and balance puzzles

    Geometric Games

    Browser puzzle game

    Side project — a browser puzzle game about recreational geometry. Drag points, lines, and shapes with the mouse to solve cut, inscribe, and balance puzzles.

  • Poker Timer — tournament countdown with current and next blind levels

    Poker Timer

    Tournament timer & manager

    Tournament timer and manager for home games, offline poker rooms, and multi-table events. The site hosts a lightweight web version; the Windows desktop build adds tournament structures, player tracking, prize-pool math, and theme customization.

What we do

autocubes is a design and engineering studio working with clients worldwide. We take projects from first sketch to deployed product — design, code, and motion under one roof, in English or Russian.

  • Websites & landing pages

    Conversion-led marketing sites and landing pages — strategy, design, build, and an SEO-ready launch.

  • Branding & identity

    Brand identity and brand systems: logo, typography, color, and guidelines that stay consistent everywhere the brand shows up.

  • Apps & 3D motion

    Web applications and 3D motion — product interfaces, interactive experiences, and commercial-grade CGI.

FAQ

What does autocubes do?

autocubes is a design and engineering studio. We design and build conversion-led websites, landing pages and web apps, create brand identities, and produce 3D motion and CGI — handling everything from concept to deployed product.

How much does a project cost?

It depends on scope. After a short brief we send a fixed quote — no hourly billing and no surprises. A focused landing page costs a fraction of a multi-page product site, so we always suggest the smallest version that meets the goal.

How long does a project take?

A typical landing page ships in a few weeks; larger sites and apps take longer. We agree on the timeline before starting and break the work into visible milestones, so you see progress from the first week.

What does the process look like?

Brief and goals first, then a design concept, then the build. You review the work at each milestone. We deploy, hook up analytics and SEO basics, and hand over everything — code, design sources, and access.

Do you work with international clients?

Yes. We work remotely with clients worldwide and communicate in English or Russian. We have shipped multilingual projects, including full right-to-left Arabic support.

Who owns the result?

You do. The full code, design sources, and all accounts are handed over at the end of the project — nothing stays locked to us.

Get in touch

Moscow — view from our desk
--:--Russia · Moscow
@autocubes